We got back in action around 3am.

IMG_0573.jpeg

IMG_0570.jpeg

IMG_0580.jpeg

IMG_0582.jpeg

IMG_0584.jpeg

IMG_0586.jpeg

Denise worked on wiring up the panels and made quick work of getting them looking nice and neat.
Each array has three strings of 15 panels each-these are high voltage circuits with each string being in the 1000 volt range.

IMG_0588.jpeg

IMG_0590.jpeg

Meanwhile, I worked on preparing all the struts and gutters to hold the wiring junction point and PV disconnects.
By breakfast time at 9am we had the first array nearly done, and some groundwork laid for the second array so it will go faster.

Originally posted on: August 5, 2025 at 4:59 pm
Scroll to top