Check it out!
First, some little parts and tools need to be set up and assembled.
Then some bigger tools and parts come into play.
I don’t always lift heavy things, but when I do, I prefer to use a crane. 😀 😀
Everything nice and level, please!
We install the backup generator under the array. It helps protect it, keeps it close to the rest of the power system for easy maintenance and cost-effective wiring, and often times helps project the sound away from the buildings. In this overhead picture, you can see where we set it just to the left of all the underground conduit stub-ups.
These batteries weigh well over 300 pounds each. We prefer using the crane to set them.
We built a pretty signifigant strut structure to hold the two batteries to the array structure.
Here on this installation, we mount all of the heavy gear like the gutters and inverter before we install the rails so that we can use the crane. It speeds things up, saves our backs, but does make it so we have to work in the sun more.
Then the rails and panels go on.
And with that-the array is done!
Next up is wiring all this stuff up!