There wasn’t much visual progress on Friday, and a considerable amount of time was spent in some meetings, and figuring out the logistics of getting the last load of parts onsite for next week’s push.
Around noon, it was time to roll up our show and hit the road.
The inverter room is starting to take shape and is looking good.
Now that Kevin had the Freightshaker back in operation, we would be taking it for the trip back home, which was unplanned but necessary for what we had to haul back to the job come Monday.
We spent Saturday trying to catch up on sleep, laundry ( ok-I actually didn’t do shit with laundry. Denise thankfully handles that, or we’d both be wearing shit that had somehow turned pink in the wash if I did laundry 🙄), and trying to relax a little.
We spent Sunday fishing our excavator out of the job it was on to load on a trailer.
Monday morning was final load up and prepping the excavator and it’s gaggle of attachments for a trip.
One excavator, two regular buckets, one tilting bucket, one bad-ass rock bucket, and one hammer, getting their final load check before hitting the freeway and heading to the mountain.
If you’re wondering why the hell we need an excavator for a roof mount solar installation-stay tuned.
That was about all for Monday as most of the day was spent on the road.
Teaser for Tuesday’s agenda-my wife is going to strip tomorrow.