Some we installed our own temporary points on this first big disconnect.
We spent several hours carefully measuring, laying out and installing strut on our aluminum posts to accept the panels that needed to be mounted.
Denise also put some knockouts in the bottom of that first big disconnect to correspond with the 4” conduits in the concrete slab.
Once again-thank god for the crane!
As the sun went down and the moon came up, we wrapped up getting the first big disconnect all mounted up and took a much needed dinner break.
After dinner, we did a little night work tidying up and preparing for the long day tomorrow is sure to be.
Now it’s time for a shower and some sleep!!💤