These panels are big and heavy and don’t come with any lifting points.

IMG_1528.jpeg

Some we installed our own temporary points on this first big disconnect.

We spent several hours carefully measuring, laying out and installing strut on our aluminum posts to accept the panels that needed to be mounted.
Denise also put some knockouts in the bottom of that first big disconnect to correspond with the 4” conduits in the concrete slab.

IMG_1531.jpeg

Once again-thank god for the crane!

IMG_1532.jpeg

IMG_1535.jpeg
IMG_1536.jpeg

IMG_1538.jpeg

IMG_1540.jpeg

IMG_1541.jpeg

As the sun went down and the moon came up, we wrapped up getting the first big disconnect all mounted up and took a much needed dinner break.

IMG_1542.jpeg

IMG_1543.jpeg

After dinner, we did a little night work tidying up and preparing for the long day tomorrow is sure to be.
Now it’s time for a shower and some sleep!!💤