Denise putting the final touches on the installation of our gutter.
There was one last little panel to install and it proved to be a tricky little SOB. But we worked into the night and got it mounted.
Here we are towards the end of the night with everything that we could put together put together in buttoned up ready for a storm. At this point, we have all the tools loaded back on the truck, and only a few things left to tidy up for the evening.
This compartment on the truck pleases me when it’s all put back together correctly.
Come to think of it, this whole side of the truck looks nice when it’s all put away.
And here is everything all buttoned up in the truck ready to roll.
The last task of the night was to tarp up the two inverters that we were unable to install due to the wrong parts being shipped to us. Right as we got the tarp on the first of the rain storm hit.😄😄
By this point it was 11pm, we had been up since 4am, and it was way past time for a shower and some shut eye.
Looked like we were going to be running a wee bit short on that shut eye come tomorrow morning. 😬